Disclaimer: The ministerial authority of the GPPB and its Technical Support Office is limited only to the maintenance of the OBP, validation of requests for registration, and assistance to Procuring Entities (PEs) in case of loss of access or need for updating of its account details (except for agency name) after registration. Hence, posting and updating of status of blacklisted entities are vested within the PE.
Questions and clarifications must be directed towards the PE who posted the blacklisting order.
# | Blacklisted Entity | Procuring Entity | Project | Offense/s | Sanction/s | Period of Suspension |
---|---|---|---|---|---|---|
1 | PACIFIC SUMMIT CONSTRUCTION GROUP, INC. (PSCGI) | Philippine International Trading Corporation | Construction of DOH Ten (10) Rural health Units - Small Model in Luzon | 1) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 2) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. 3) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2022-09-28 - 2023-09-27 |
2 | PACIFIC SUMMIT CONSTRUCTION GROUP, INC. (PSCGI) | Philippine International Trading Corporation | Construction of DOH Ten (10) Rural health Units - Small Model in Visayas | 1) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract; 2) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%; 3) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2022-09-28 - 2023-09-27 |
3 | PACIFIC SUMMIT CONSTRUCTION GROUP, INC. (PSCGI) | Philippine International Trading Corporation | Construction of DOH Seventeen (17) Rural health Units - Small Model in Mindanao | 1) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract; 2) Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%; 3) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2022-09-28 - 2023-09-27 |
4 | JCJD Construction | Cebu South Medical Center | One Job Order for Cebu South Medical Center Infrastructure Projects: A. Construction of New Building "B" Septic Tank B. Completion of Acute-Chronic Psychiatric Facility- Phase 3 | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2022-09-30 - 2023-09-30 |
5 | Stoneline Construction | Provincial Government of South Cotabato | Construction of Level II Potable Water System | 1. Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 2. Other violation specified under: a. Due to the Contractor’s fault and after the contract time has expired, it has incurred a negative slippage of ten percent (10%) or more in the completion of the work; b. The contractor does not execute the Works in accordance with the contract or persistently or flagrantly neglects to carry out its obligations under the contract. | One Year Blacklisting | 2022-10-25 - 2023-10-24 |
6 | J.D. Venzon Construction | Clark Development Corporation | CDC Office Renovation Phase 1 (COA Office Extension at Bldg. 2121) | Withdrawal of a bid, or refusal to accept an award or enter into contract with the government without justifiable cause, after he had been adjudged as having submitted the Lowest Calculated Responsive Bid | One Year Blacklisting | 2022-10-28 - 2023-10-28 |
7 | NTT DATA PHILIPPINES, INC. | National Power Corporation | Supply, Delivery, Installation, Testing and Commissioning of CIS-HRIS Solution under Contract No. LOG MSSP 2020-02-014-CMR/PR No. HO-IST19-008/PB191216-ZT00513 | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2022-11-04 - 2023-11-04 |
8 | FIX AND CARE REF AND AIRCON SERVICES, INC. | University of the Philippines | Supply, Delivery, Installation and Commissioning of Two (2) Units Air-conditioning units for the College of Music | 1) Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTPâ€). 2) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 3) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | Two Year Blacklisting | 2021-11-16 - 2023-11-15 |
9 | Abastillas Livestock Farm | CITY GOVERNMENT OF VALENCIA | Supply and Delivery of Livestock for BUB 2014 LPRAP at CVO, Valencia City, Bukidnon and Supply and Delivery of Livestock for BUB 2015 LPRAP at CVO, Valencia City, Bukidnon | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2022-11-21 - 2023-11-21 |
10 | AGMS Information Technology Solutions | Department of Budget and Management | Renewal of Adobe Cloud-Based Multimedia Editing Tool Subscription | 3 Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTPâ€). | One Year Blacklisting | 2022-11-24 - 2023-11-24 |
11 | Harlance Builders | Department of Public Works and Highways Central Office | 22PD0055 - Basic Infrastructure Program (BIP) - Construction of Multi-Purpose Building (Health Center) at Barangay San Luis Village, Baguio City, Benguet | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2022-11-25 - 2023-11-25 |
12 | Pharmally Pharmaceutical Corporation – Business Beyond Limits OPC Joint venture | Department of Health - Central Office | Procurement of Face Shield under IB No 2021-135 | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2022-12-20 - 2023-12-20 |
13 | Best Choice Enterprises | Department of Trade and Industry - Main | Supply and Delivery of Various Inks and Toners | Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. | One Year Blacklisting | 2022-12-20 - 2023-12-20 |
14 | CPG Contractor Services | Department of Health - Central Office | Construction of Marawi City Health Unit - Infrastructure package under Emergency Assistance for Reconstruction and Recovery of Marawi (EARRM) - Health Component of the ADB Administered Grant Funds | Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTPâ€); Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract; Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. | One Year Blacklisting | 2022-12-21 - 2023-12-21 |
15 | CPG Contractor Services | Department of Health - Central Office | Construction of Lumbayanague Rural Health Unit - Infrastructure and Recovery of Marawi (EARRM) - Health Component of the ADB Administered Grant Funds | Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTPâ€); Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract; Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%; | One Year Blacklisting | 2022-12-21 - 2023-12-21 |
16 | Zhujar Manufacturing Incorporation | Veterans Federation of the Philippines | Supply and Delivery of Vests/Chaleco and Oversea Caps | Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. | One Year Blacklisting | 2022-12-27 - 2023-12-27 |
17 | HERVELYN INTERTRADING & BUILDERS CORPORATION | National Irrigation Administration - Malitubog-Maridagao Irrigation Project Stage II | MMIP-II LMC-020 Package 1, Construction of Canal & Structures Along RMC2 Station 8+680-9+480 and Lateral C Station 0+000-1+677 | Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. Renewal of the effectivity dates of the performance security after its expiration during the course of contract implementation. Does not actually have on the project site the minimum essential equipment listed on the bid necessary to prosecute the works in accordance with the approved work plan and equipment deployment schedule as required for the project. | One Year Blacklisting | 2023-01-04 - 2024-01-03 |
18 | HERVELYN INTERTRADING & BUILDERS CORPORATION | National Irrigation Administration - Malitubog-Maridagao Irrigation Project Stage II | MMIP-II LMC-020 Package 3, Construction of Canal & Structures Along RMC2 Station 10+520-9+480 -11+460 | Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. Renewal of the effectivity dates of the performance security after its expiration during the course of contract implementation. Does not actually have on the project site the minimum essential equipment listed on the bid necessary to prosecute the works in accordance with the approved work plan and equipment deployment schedule as required for the project. | One Year Blacklisting | 2023-01-04 - 2024-01-03 |
19 | HERVELYN INTERTRADING & BUILDERS CORPORATION | National Irrigation Administration - Malitubog-Maridagao Irrigation Project Stage II | MMIP-II LMC-021 Package 1, Construction of Canal & Structures Along RMC2 Station 11+460-12+540 | Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. Renewal of the effectivity dates of the performance security after its expiration during the course of contract implementation. Does not actually have on the project site the minimum essential equipment listed on the bid necessary to prosecute the works in accordance with the approved work plan and equipment deployment schedule as required for the project. | One Year Blacklisting | 2023-01-04 - 2024-01-03 |
20 | HERVELYN INTERTRADING & BUILDERS CORPORATION | National Irrigation Administration - Malitubog-Maridagao Irrigation Project Stage II | MMIP-II LMC-021 Package 5, Construction of Canal & Structures Along RMC2 Station 12+540-13+840 | Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. Renewal of the effectivity dates of the performance security after its expiration during the course of contract implementation. Does not actually have on the project site the minimum essential equipment listed on the bid necessary to prosecute the works in accordance with the approved work plan and equipment deployment schedule as required for the project. | One Year Blacklisting | 2023-01-04 - 2024-01-03 |
21 | A.M.A Pharma and Medical Supplies Trading | Department of Health - Center for Health Development I | Rabies Vaccine for the use of DOH CHD-I | For engaging in unlawful deed when it delivered counterfeit anti-rabies vaccines | One Year Blacklisting | 2023-01-10 - 2024-01-09 |
22 | D-THREE PEST MANAGEMENT SERVICES | Philippine Amusement and Gaming Corporation | PROCUREMENT OF THREE (3) YEARS PEST CONTROL AND DISINFECTION SERVICES OF SOG 4 FOR CITYSTATE AND MADISON SATELLITE OFFICES UNDER INVITATION TO BID NUMBER CB22-00-002CORa | SUBMISSION OF ELIGIBILITY REQUIREMENTS CONTAINING FALSE INFORMATION OR FALSIFIED DOCUMENTS | One Year Blacklisting | 2023-01-16 - 2024-01-15 |
23 | BENZQ Industrial Machinery Trading | Municipal Government Unit of Libungan, Cotabato | Procurement of Cassava Chipper with Granulator | Failure of the contractor, due solely to his or negligence, to mobilize and start work or performance within the specified period of the Notice to Proceed("NTP"). | One Year Blacklisting | 2023-01-16 - 2024-01-16 |
24 | Jody-Art Enterprises | Local Government Unit of Quezon City | Various Hardware Supplies and Others | Allowing the use of one’s name, or using the name of another for purpose of public bidding. | One Year Blacklisting | 2023-01-26 - 2024-01-26 |
25 | M-NAV SOLUTIONS, INC., VISSIM AS | Authority of the Freeport Area of Bataan | Vessel Traffic Management System | 1.Submission of eligibility requirements containing false information or falsified documents. 2.Submission of Bids that contain false information or falsified documents, or the concealment of such information in the Bids in order to influence the outcome of eligibility screening or any other stage of the public bidding. | Two Year Blacklisting | 2022-02-03 - 2024-02-02 |
26 | Control House International Supplies and Services | DEPARTMENT OF EDUCATION REGIONAL OFFICE 3 | Construction of Two (2) Storey Storage/Office Building and Completion of Two (2) Storey LRMDC Building at DepEd RO III (R3INFRA-2020-003) | Violation of Section III (A) (2a), Annex I of the 2016 Revised IRR of RA No. 9184 | One Year Blacklisting | 2023-02-07 - 2024-02-07 |
27 | New Masinloc Henry`s Construction & Supply (NMHCS) | DEPARTMENT OF EDUCATION REGIONAL OFFICE 3 | Conservation and Restoration of Gabaldon Schoolbuildings - Lot 6 (Guagua Elementary School, Pampanga) (R3INFRA-ITB2021-002) | Violation of Section III (A) (2a), Annex I of the 2016 Revised IRR of R.A. No. 9184 | One Year Blacklisting | 2023-02-07 - 2024-02-07 |
28 | New Masinloc Henry`s Construction & Supply (NMHCS) | DEPARTMENT OF EDUCATION REGIONAL OFFICE 3 | Conservation and Restoration of Gabaldon Schoolbuildings - Lot 12 (Botolan North Integrated School, Zambales) (R3INFRA-ITB2021-002) | Violation of Section III (A) (2a), Annex I of the 2016 Revised IRR of R.A. No. 9184 | One Year Blacklisting | 2023-02-07 - 2024-02-07 |
29 | Grinder Civil Engineering Construction | Philippine National Police- Police Regional Office 8 | Construction of Perimeter Fence of Tacloban City Police Office | 21 Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. 23 Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-02-14 - 2024-02-14 |
30 | Embrocal Builders, Inc. | PHILIPPINE AIR FORCE PRpOCUREMENT CENTER | PB-PAFSBAC-001-21 for the Repair of AIr Force City Inn, Building Nr 6892 | 5 Refusal or failure to post the required performance security within the prescribed time. | Two Year Blacklisting | 2022-02-17 - 2024-02-17 |
31 | JOHNSEV ENTERPRISES | Occidental Mindoro State College | Rehabilitation of 2-Storey Classroom Building of the College of Criminal Justice Education (CCJE) at OMSC Labangan. | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Quality of materials and workmanship not complying with the approved specifications. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-02-20 - 2024-02-19 |
32 | LG and M Corporation | Department of Education - Regional Office I | Printing and Delivery of 3rd and 4th Quarter Self-Learning Modules (SLMs) for Lot 7-Grade 7, 4th Quarter-PE; Lot 11- Grade 7, 4th Quarter-Arts and PE; Lot 12-Grade 8, 3rd Quarter-Mathematics; Lot 13-Grade 8, 4th Quarter-AP and PE; Lot 15-Grade 10, 3rd Quarter-Mathematics and Filipino | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-02-23 - 2024-02-23 |
33 | ADL General Construction | Department of Social Welfare and Development - Cordillera Administrative Region | Completion of Four (4) Storey Training Center Building | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Quality of materials and workmanship not complying with the approved specifications. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-02-28 - 2024-02-28 |
34 | Lift and Lifestyle Elevator Supply and Installation Services | Cagayan Economic Zone Authority | Supply, Delivery, Installation, Testing and Commissioning of Elevators for CEZA Corporate Center and CEZA Commercial Center at Sta. Ana, Cagayan | 13 Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTP”). 14 Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 23 Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-03-01 - 2024-02-29 |
35 | MLTP Enterprises | PHILIPPINE NAVY PROCUREMENT CENTER | Supply and Delivery of 72-100 RF Supplies (Lot 2: Non-Accountable Forms) of PN Units CY 2023 | Submission of eligibility requirements containing false information or falsified documents. | One Year Blacklisting | 2023-03-17 - 2024-03-17 |
36 | Melecio Construction | City of Baguio, Benguet | Repair and Rehabilitation of Railings, Sidewalks, Median Dividers, Geometric Design and Steel Grates at the Central Business District (Carantes-Perfecto Street) Baguio City | Default of the contractor | One Year Blacklisting | 2023-03-20 - 2024-03-19 |
37 | J-Marbela Construction and Supply | City Government of Naga | Construction of 2-Storey 8-Classroom School Building and Road Concreting Project at CCN/Molecular Laboratory Access Road | #14 - Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. #22 - Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Quality of materials and workmanship not complying with the approved specifications. | One Year Blacklisting | 2023-03-21 - 2024-03-20 |
38 | AWB Chekibo Company | PHILIPPINE AIR FORCE PRpOCUREMENT CENTER | PO# 2021-3-0524 Proc of 5 rolls 38mm THHN wire & 14 other L/I; PO# 2021-4-0684 Proc of 10 pails Aircraft Toilet Sanitizer (25L/pail) PN: ADROX 1823 (FN) & 16 other L/I; PO# 2021-4-0689 Proc of 1 lot Maintenance and Cleaning of Air Conditioning units of OCHA; PO# 2021-4-0690 Proc of 40 pcs LED Light bulb 25W & 26 other L/I | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | Two Year Blacklisting | 2022-03-29 - 2024-03-28 |
39 | HITECH LIGHTING WORLD CORPORATION | Subic Bay Metropolitan Authority | SUPPLY & INSTALLATION OF NEW PERIMETER LIGHTING AT SUBIC INTERNATIONAL AIRPORT | 1. Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause 2. Unsatisfactory progress in the delivery of the goods | One Year Blacklisting | 2023-03-29 - 2024-03-28 |
40 | DM-XTechnologies, Inc. | National Power Corporation | Supply, Delivery and Testing of 1 x 1.0MW (Standby Power) Trailer-Mounted, Containerized Diesel Generator Set for Minuyan, San Jose Del Monte, Bulacan | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2023-03-29 - 2024-03-28 |
41 | Paropa Construction and Supply | Department of Education - Division of Surigao City | Repair/Rehabilitation of Two (2) Storey (OSDS Building) and Three (3) Storey (SGOD and CID Building) Division Offices Building under CY 2022 Quick Response Funds (QRF) | Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-04-01 - 2024-03-31 |
42 | AK ANNES KITCHEN FOOD, INC | Subic Bay Metropolitan Authority | CATERING SERVICES: FOR SBMA 2022 YEAR-END THANKSGIVING AFFAIR (LOT C) | 1. Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause 2. Unsatisfactory progress in the delivery of the goods by the manufacturer | One Year Blacklisting | 2023-04-14 - 2024-04-13 |
43 | Jessie Construction Services | Department of Public Works and Highways Central Office | 20PE0100, Construction/Improvement of Access Roads Leading to Declared Tourism Destinations - Timbac Caves Road Leading to Timbac Caves and Mummy of Apo Anno, Atok/Kabayan, Benguet | Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. | One Year Blacklisting | 2023-04-17 - 2024-04-16 |
44 | Jozeth Trading | Department of Education - Regional Office I | Supply and Door-to-Door Delivery of Technical, Vocational and Livelihood Materials, Tools and Equipment for Public Senior High Schools in DepEd Region I on the lots (Lot Nos. 1, 8, 11, 13, 17, 18, 19, 21, 22, 26, B5, B6, B11, B13 and B14) | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-04-18 - 2024-04-18 |
45 | GLOBAL MYOHO RENGE COPY, INC. | Philippine Amusement and Gaming Corporation | PROCUREMENT OF CONSULTING SERVICES FOR THE DEVELOPMENT, OPERATION, AND MANAGEMENT OF INTERMEDIATION PLATFORM/AUDIT PROGRAM FOR THE PHILIPPINE OFFSHORE GAMING OPERATIONS (POGO) | TERMINATION FOR DEFAULT | One Year Blacklisting | 2023-04-20 - 2024-04-19 |
46 | HIGHWEB TRADE LTD. | Philippine Amusement and Gaming Corporation | PROCUREMENT OF CONSULTING SERVICES FOR THE DEVELOPMENT, OPERATION, AND MANAGEMENT OF INTERMEDIATION PLATFORM/AUDIT PROGRAM FOR THE PHILIPPINE OFFSHORE GAMING OPERATIONS (POGO) | TERMINATION FOR DEFAULT | One Year Blacklisting | 2023-04-20 - 2024-04-19 |
47 | COMFAC CORPORATION | Philippine Amusement and Gaming Corporation | PROCUREMENT OF CONSULTING SERVICES FOR THE DEVELOPMENT, OPERATION, AND MANAGEMENT OF INTERMEDIATION PLATFORM/AUDIT PROGRAM FOR THE PHILIPPINE OFFSHORE GAMING OPERATIONS (POGO) | TERMINATION FOR DEFAULT | One Year Blacklisting | 2023-04-20 - 2024-04-19 |
48 | Mendo Enterprises | Office of the Press Secretary | Procurement of Supply and Delivery of Motor Vehicle Parts for Repair and Maintenance of OPS Vehicles | 1. Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTP”). 2. Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 3. Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. | One Year Blacklisting | 2023-04-24 - 2024-04-23 |
49 | DCLABRO3 CONSTRUCTION | National Power Corporation | Expansion and Repair of Powerhouse and Transfer of Switchyard of Itbayat DPP | * Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract * Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. * The contractor has engaged, before or during implementation of the contract, in unlawful deeds and behaviors relative to contract acquisition and implementation as enumerated in Section III.D. of the Guidelines on Termination of Contracts. | One Year Blacklisting | 2023-05-15 - 2024-05-14 |
50 | E.S. Pua Construction | National Irrigation Administration MARIIS Division III | 2023-D3-RNIS-Aurora-Package 9 | 21 Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. | One Year Blacklisting | 2023-05-17 - 2024-05-16 |
51 | Rolando C. Siccion Surveying Office | Department of Public Works and Highways Central Office | 22CSZ018 - Consulting Services for the Environmental Impact Assessment, Gender-Responsive Social Impact Assessment, and Preliminary Right-of-Way Action Plan of the Metro Cebu Expressway Project | Submission of Bids that contain false information or falsified documents, or the concealment of such information in the Bids in order to influence the outcome of eligibility screening or any other stage of the public bidding. | One Year Blacklisting | 2023-05-18 - 2024-05-17 |
52 | Heratyke Trading | Department of Public Works and Highways Central Office | PO No. C 0113-0313-19 Procurement of One (1) Unit Flipchart and one (1) unit Data Center Labelling Tool | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2023-05-25 - 2024-05-24 |
53 | Aremos Security and Investigation Agency | Sandiganbayan | One (1) Lot Provision of Third Party Security Services Personnel and K-9 Team for the Sandiganbayan for One (1) Year | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2023-06-05 - 2024-06-04 |
54 | N-22 Construction and Trading | Clark Development Corporation | Metal Barrier along M.A. Roxas Highway/Road Safety | Submission of eligibility requirements containing false information or falsified documents. | One Year Blacklisting | 2023-06-05 - 2024-06-04 |
55 | CTC Builders and Supplies Inc. | Department of Public Works and Highways Central Office | 22FE0064 - OO1: Bridge Program - Widening of Permanent Bridges - Bagula Bridge (B00390LZ), along Daang Maharlika (LZ) | Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-06-07 - 2024-06-06 |
56 | 1. SHEEN CONSUMERS COOPERATIVE | PROVINCIAL GOVERNMENT OF NEGROS OCCIDENTAL | a. Various Procurement Projects from Calendar Year 2018 - 2022 | Allowing the use of one’s name, or using the name of another for purpose of public bidding. | One Year Blacklisting | 2023-06-26 - 2024-06-25 |
57 | Vancity Construction | DEPARTMENT OF AGRICULTURE | Construction of Sinamongan Small Water Impounding Project | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-06-27 - 2024-06-26 |
58 | Renton Engineering Services | Department of Public Works and Highways Central Office | 22PD0037 Basic Infrastructure Program (BIP) - Construction of Road from Scout Barrio Main Road to Barangay Upper Dagsian, Baguio City, Benguet | Failure of contractor to repair works, at his own expense, of any defect or damage to the infrastructure projects on account of the use of materials of inferior quality within ninety (90) days from the time the HoPE has issued an order to undertake repair. | One Year Blacklisting | 2023-06-27 - 2024-06-26 |
59 | GoldenTec Contractor Corporation | University of the Philippines | One (1) Lot Installation of New Street Lighting Along the Academic Oval University of the Philippines Diliman Campus, Quezon City | 1) Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 2) Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-07-05 - 2024-07-04 |
60 | SSR CONSTRUCTIO AND ENTERPRISE | National Food Authority - Regional Office XIV | REPAIR/REHABILITATION OF NFA SULU PROVINCIAL OFFICE | 21 Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. 22 Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Quality of materials and workmanship not complying with the approved specifications. 23 Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | Two Year Blacklisting | 2022-07-08 - 2024-07-07 |
61 | TREADSTONE KONSTRUCT AND BUILDING SUPPLY SPECIALIST, INC. | Philippine International Trading Corporation | CONSTRUCTION/REPAIR/REHABILITATION OF ACADEMIC BUILDINGS, SECOND FLOOR CAS ANNEX II AND UPMO BUILDING OF THE UNIVERSITY OF THE PHILIPPINES LOS BAÑOS | -Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. -Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. -Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | One Year Blacklisting | 2023-07-12 - 2024-07-11 |
62 | DCLABRO3 Construction | PHILIPPINE AIR FORCE PRpOCUREMENT CENTER | PAFPC-CDS-21-200 IMPROVEMENT OF AWC BUILDING AT FAB | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2023-07-14 - 2024-07-13 |
63 | DCLABRO3 CONSTRUCTION | National Power Corporation | Renovation of ERSD Warehouse and PES Laboratory at Minuyan, San Jose Del Monte, Bulacan | Refusal or failure to post the required performance security within the prescribed time. | Two Year Blacklisting | 2022-08-01 - 2024-07-31 |
64 | R2CG BUILDERS, INC. | Polytechnic University of the Philippines | Repair/Rehabilitation of Hasmin hotel Building | 1. Withdrawal, without justifiable reason, of bid during the period of bid validity required in the bidding documents; and 2. Submission of eligibility requirements containing false information or falsified documents. | Two Year Blacklisting | 2022-08-03 - 2024-08-03 |
65 | Kuatako Construction & General Contractor | Philippine Overseas Employment Administration | Renovation of POEA Building Ground Floor and 2nd Floor Male and Female Public Comfort Rooms | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract; Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | Two Year Blacklisting | 2022-08-05 - 2024-08-05 |
66 | ELPA CONSTRUCTION | PHILIPPINE AIR FORCE PRpOCUREMENT CENTER | PAFPC-CDS-19-134 Repair of Barracks 5191, Building Nr 9003-002 | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | Two Year Blacklisting | 2022-08-21 - 2024-08-21 |
67 | RPD Consulting Inc. | National Irrigation Administration - Regional Office No. 8 | Consulting Services for Formulation of Irrigation Water Resources Management Plan (IWRMP) in Preparation of Rehabilitation of Water Resources Management Supporting Irrigation Systems of BITO River Irrigation System. | Poor performance by the consultant of his services arising from his fault or negligence. Failure to deliver critical outputs due to consultants fault or negligence. Outside of force majeure, the Consultant fails to deliver or perform the Outputs and Deliverables within the period(s) specified in the contract, or within any extension thereof granted by the Procuring Entity pursuant to a request made by the Consultant prior to the delay | One Year Blacklisting | 2023-08-25 - 2024-08-24 |
68 | RPD Consulting Inc. | National Irrigation Administration - Regional Office No. 8 | Consulting Services for Formulation of Irrigation Water Resources Management Plan (IWRMP) in Preparation of Rehabilitation of Water Resources Management Supporting Irrigation Systems of BAO River Irrigation System | Poor performance by the consultant of his services arising from his fault or negligence - Failure to deliver critical outputs due to consultants fault or negligence. Outside of force majeure, the Consultant fails to deliver or perform the Outputs and Deliverables within the period(s) specified in the contract, or within any extension thereof granted by the Procuring Entity pursuant to a request made by the Consultant prior to the delay | One Year Blacklisting | 2023-08-25 - 2024-08-24 |
69 | Paropa Construction and Supply | Department of Health Center for Health and Development Caraga ( DOH CHD Caraga) | Proposed Completion/Repair/Renovation of Brgy. Tangbo BHS | 1. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. 2. Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2023-09-05 - 2024-09-04 |
70 | EGCG BUILDERS AND SUPPLY | Municipal Government Unit of Libungan, Cotabato | Re-bidding of Procurement of Information & Communication Technology Equipment | 1.) Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed ("NTP"). 2.) Failure by the contractor to fully and faithfully comply with its contractual obligation without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | One Year Blacklisting | 2023-09-13 - 2024-09-12 |
71 | Northern Star Investigation & Security Agency | Veterans Federation of the Philippines | Procurement of Security Services | For the irregular Remittances of Social Security System (SSS), PhilHealth, and Home Development Mutual Fund (Pag-ibig) monthly contributions of the personnel. | One Year Blacklisting | 2023-09-20 - 2024-09-20 |
72 | L.M. Baltonado Construction | Department of Public Works and Highways Central Office | 1. 19IA0007 - Rehabilitation of Damaged Paved Roads - Tertiary Roads, Maripipi Circumferential Road, K0014+000 - K0015+500 (From 11.81517314 deg, 124.3176803 deg to 11.81536483 deg, 124.329689 deg) and, 2. 20IA0023 - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved - Tertiary Roads - Maripipi Circumferential Road, K0004+585 - K0006+600 (124.51507, 11.58347 - 124.51518, 11.58332) Maripipi, Biliran Province | 1. Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 2. Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. 3. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | Two Year Blacklisting | 2022-12-12 - 2024-12-11 |
73 | GU Engineering Solutions Inc. | NATIONAL IRRIGATION ADMINISTRATION-MAGAT RIVER INTEGRATED IRRIGATION SYSTEM-DAM AND RESERVOIR DIVISION | TANDEM HIGH PRESSURE GATES REFURBISHMENT | Refusal or failure to post the required performance security within the prescribed time. | Two Year Blacklisting | 2023-02-03 - 2025-02-02 |
74 | DCLABRO3 Construction | PHILIPPINE AIR FORCE PRpOCUREMENT CENTER | PAFPC-CDS-21-201 REHABILITATION OF THE 557TH CEISS BUILDING AND FACILITIES AT FAB | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | Two Year Blacklisting | 2023-07-15 - 2025-07-14 |
75 | DCLABRO3 Construction | PHILIPPINE AIR FORCE PRpOCUREMENT CENTER | PAFPC-CDS-21-202REPAIR OF BULWAGANG MALIPUNYO BUILDING AT FAB | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. | Two Year Blacklisting | 2023-07-16 - 2025-07-15 |
# | Blacklisted Entity | Procuring Entity | Project | Offense/s | Sanction/s | Period of Suspension |
---|---|---|---|---|---|---|
1 | PHILIPPINE LIFE SAVING EQUIPMENT INC. | PHILIPPINE MERCHANT MARINE ACADEMY | Procurement of Full Mission Bridge Simulator and Full Mission Engine Simulator with Civil Works | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. | Permanent Blacklisting | 2020-10-27 - permanent |
2 | Bonum Manpower and General Services | Subic Bay Metropolitan Authority | Two (2) Year Contract for Janitorial Services | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. | Permanent Blacklisting | 2020-07-28 - permanent |
3 | I.C. TEJADA CONSTRUCTION | Department of Social Welfare and Development - National Capital Region | ITB 18-10-17 - LOT 1 MAJOR REPAIR OF DIETARY KITCHEN FOR THE ELSIE GACHES VILLAGE ITB 18-07-14 - LOT 9 CONSTRUCTION OF PERIMETER WALL FOR THE HAVEN FOR WOMEN ITB 18-07-14 - LOT 15 EXTENSION OF DIETARY KITCHEN FOR THE NAYON NG KABATAAN | 14 Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. 21 Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. 22 Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Quality of materials and workmanship not complying with the approved specifications. 23 Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | Permanent Blacklisting | 2023-03-24 - permanent |
4 | Green Leaf Concepts, Services, and Products Co. | City of Baguio, Benguet | Supply, Delivery, and Installation of Strawberry Greenhouses with Planter Boxes, Strawberry runners, and additional framer bee box, including training simultaneous with strawberry cultivation | Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Unsatisfactory progress in the delivery of the goods by the manufacturer, supplier or distributor arising from his fault or negligence and/or unsatisfactory or inferior quality of goods, as may be provided in the contract. Poor performance by the consultant of his services arising from his fault or negligence - Defective design resulting in substantial corrective works in design and/or construction. Poor performance by the consultant of his services arising from his fault or negligence - Failure to deliver critical outputs due to consultant’s fault or negligence. Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. | Permanent Blacklisting | 2023-04-06 - permanent |
# | Blacklisted Entity | Procuring Entity | Project | Offense/s | Sanction/s | Period of Suspension |
---|---|---|---|---|---|---|
1 | BC CUERPO CONSTRUCTION CORPORATION | National Irrigation Administration - Malitubog-Maridagao Irrigation Project Stage II | MMIP-II LMC-021 Package 6, Construction of Canal & Structures Along RMC2 Station 13+840-14+900 | Willful or deliberate abandonment or non-performance of the project or contract by the contractor resulting to substantial breach thereof without lawful and/or just cause. Renewal of the effectivity dates of the performance security after its expiration during the course of contract implementation. Does not actually have on the project site the minimum essential equipment listed on the bid necessary to prosecute the works in accordance with the approved work plan and equipment deployment schedule as required for the project. | One Year Blacklisting | 2022-12-29 - 2023-12-28 |
2 | R R Encabo Contructors Inc | Department of Health - Central Office | Renovation and Retrofitting of Research Institute for Tropical Medicine under WB-PCERP-39-2022 | Failure of the contractor, due solely to his fault or negligence, to mobilize and start work or performance within the specified period in the Notice to Proceed (“NTP”). Failure by the contractor to fully and faithfully comply with its contractual obligations without valid cause, or failure by the contractor to comply with any written lawful instruction of the procuring entity or its representative(s) pursuant to the implementation of the contract. Poor performance by the contractor or unsatisfactory quality and/or progress of work arising from his fault or negligence as reflected in the CPES rating sheet - Negative slippage of 15%. | One Year Blacklisting | 2023-03-13 - 2024-03-14 |